Library Catalog

>>
Library Catalog
>
000 nam
001 2210080273323
005 20140818153800
008 900610s1996 bnka FB 001a kor
040 a221008
100 a손동찬
245 00 a분절마감기법을 적용한 고층아파트 공사관리 개선에 관한 연구/d손동찬 [著]. -
260 a부산:b동아대학교 산업대학원,c1996. -
300 a52장.:b삽도;c26cm. -
502 a학위논문(석사)-b동아대학교 동아대학교 산업대학원c건축공학과 전공d1997년2월
520 b영문초록 : Generally, the reduction of duration in the highrise building works took the focus skelton structure works which unit floor plan is repeatedly structure, but could be reduced the duration in the finishing works. In this point, the purpose of this study was to reduce the duration and improvement of construction management, in the highrise apartment by the application of group division method for the finishing work. The results obtained from this study are as follows. 1. In case of the highrise apartment finishing works, which unit floor plan is repeatedly the same type and construct several buildings at the same time, was able to reduce the duration by the application of group division method. 2. The reduction of duration by group division method was decided by type of group division section, selection of standard finishing work item, earliest starting of following work and the smallest works in first section of group division. 3. The reduction of duration by the application of group division method was able to save total cost without increasing the direct cost. 4. The group division method was able to improve quality control and safety control, because its method could be efficiently applicated to improve on planning, resource levelling, continuous and skillful works.
650 a분절마감기법a고층아파트a공사관리
856 adonga.dcollection.netuhttp://donga.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000002145220
950 aFB
950 a비매품b₩3,000c(추정가)
분절마감기법을 적용한 고층아파트 공사관리 개선에 관한 연구
Material type
학위논문 동서
Title
분절마감기법을 적용한 고층아파트 공사관리 개선에 관한 연구
Author's Name
Publication
Physical Description
52장: 삽도; 26cm. -
학위논문주기
학위논문(석사)- 동아대학교 동아대학교 산업대학원 건축공학과 전공 1997년2월
Keyword
영문초록 : Generally, the reduction of duration in the highrise building works took the focus skelton structure works which unit floor plan is repeatedly structure, but could be reduced the duration in the finishing works. In this point, the purpose of this study was to reduce the duration and improvement of construction management, in the highrise apartment by the application of group division method for the finishing work. The results obtained from this study are as follows. 1. In case of the highrise apartment finishing works, which unit floor plan is repeatedly the same type and construct several buildings at the same time, was able to reduce the duration by the application of group division method. 2. The reduction of duration by group division method was decided by type of group division section, selection of standard finishing work item, earliest starting of following work and the smallest works in first section of group division. 3. The reduction of duration by the application of group division method was able to save total cost without increasing the direct cost. 4. The group division method was able to improve quality control and safety control, because its method could be efficiently applicated to improve on planning, resource levelling, continuous and skillful works.
관련 URL

Holdings Information

Call no. : 549 손225분
RReservation
MMissing Book Request
CClosed Stack Request
IInter-Campus Loan
CPriority Cataloging
PPrint
Registration no. Call no. Location Mark Location Status Due for return Service
Registration no.
E0557666
Call no.
549 손225분
Location Mark
D
Location
부민학위논문실
Status
대출불가 (소장처별 대출 불가)
Due for return
Service
Registration no.
E0557667
Call no.
549 손225분 =2
Location Mark
D
Location
부민학위논문실
Status
대출불가 (소장처별 대출 불가)
Due for return
Service

Book Overview

Full menu