245 00 a분절마감기법을 적용한 고층아파트 공사관리 개선에 관한 연구/d손동찬 [著]. -
260 a부산:b동아대학교 산업대학원,c1996. -
300 a52장.:b삽도;c26cm. -
502 a학위논문(석사)-b동아대학교 동아대학교 산업대학원c건축공학과 전공d1997년2월
520 b영문초록 : Generally, the reduction of duration in the highrise building works took the focus skelton structure works which unit floor plan is repeatedly structure, but could be reduced the duration in the finishing works. In this point, the purpose of this study was to reduce the duration and improvement of construction management, in the highrise apartment by the application of group division method for the finishing work. The results obtained from this study are as follows. 1. In case of the highrise apartment finishing works, which unit floor plan is repeatedly the same type and construct several buildings at the same time, was able to reduce the duration by the application of group division method. 2. The reduction of duration by group division method was decided by type of group division section, selection of standard finishing work item, earliest starting of following work and the smallest works in first section of group division. 3. The reduction of duration by the application of group division method was able to save total cost without increasing the direct cost. 4. The group division method was able to improve quality control and safety control, because its method could be efficiently applicated to improve on planning, resource levelling, continuous and skillful works.
650 a분절마감기법a고층아파트a공사관리
856 adonga.dcollection.netuhttp://donga.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000002145220
950 aFB
950 a비매품b₩3,000c(추정가)
분절마감기법을 적용한 고층아파트 공사관리 개선에 관한 연구
종류
학위논문 동서
서명
분절마감기법을 적용한 고층아파트 공사관리 개선에 관한 연구
저자명
발행사항
형태사항
52장: 삽도; 26cm. -
학위논문주기
학위논문(석사)- 동아대학교 동아대학교 산업대학원 건축공학과 전공 1997년2월
주기사항
영문초록 : Generally, the reduction of duration in the highrise building works took the focus skelton structure works which unit floor plan is repeatedly structure, but could be reduced the duration in the finishing works. In this point, the purpose of this study was to reduce the duration and improvement of construction management, in the highrise apartment by the application of group division method for the finishing work. The results obtained from this study are as follows. 1. In case of the highrise apartment finishing works, which unit floor plan is repeatedly the same type and construct several buildings at the same time, was able to reduce the duration by the application of group division method. 2. The reduction of duration by group division method was decided by type of group division section, selection of standard finishing work item, earliest starting of following work and the smallest works in first section of group division. 3. The reduction of duration by the application of group division method was able to save total cost without increasing the direct cost. 4. The group division method was able to improve quality control and safety control, because its method could be efficiently applicated to improve on planning, resource levelling, continuous and skillful works.
관련 URL

소장정보

청구기호 : 549 손225분
도서예약
서가부재도서 신고
보존서고신청
캠퍼스대출
우선정리신청
검색지인쇄
등록번호 청구기호 별치기호 소장위치 대출상태 반납예정일 서비스
등록번호
E0557666
청구기호
549 손225분
별치기호
D
소장위치
부민학위논문실
대출상태
대출불가 (소장처별 대출 불가)
반납예정일
서비스
등록번호
E0557667
청구기호
549 손225분 =2
별치기호
D
소장위치
부민학위논문실
대출상태
대출불가 (소장처별 대출 불가)
반납예정일
서비스

책소개

전체 메뉴 보기