Status and early commissioning of the PEP-II High Energy Ring
- Resource Type
- Conference
- Authors
- Wienands, U.; Reuter, E.; Bellomo, P.; Fisher, A.; Gracia, J.; Gray, R.; Pietryka, M.; Taylor, T.; Bharadwaj, V.; Iverson, R.; Kulikov, A.; Seeman, J.T.; Turner, J.; Belser, C.; Zisman, M.; Zholents, S.
- Source
- Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167) Particle accelerator conference Particle Accelerator Conference, 1997. Proceedings of the 1997. 1:315-317 vol.1 1997
- Subject
- Fields, Waves and Electromagnetics
Engineered Materials, Dielectrics and Plasmas
Nuclear Engineering
Robotics and Control Systems
Structural beams
Magnets
Vacuum systems
Power supplies
Control systems
Laser excitation
Region 2
Pollution measurement
History
Electron beams
- Language
The High Energy Ring of the PEP-II B-Factory has been constructed in the PEP tunnel. It is now beginning beam commissioning. This report will address the status of the ring systems and our experience in commissioning the systems as well as the first beam running.