Analyze the safety of the wire rope fixtures through experiment while constructing the COMAC ministry of installed plant. Pointed out the proper use of the provisions of the steel erection specification, and the number of provisions chuck is unsafe. The timely replacement of the shackle wire rope connection ensured the security of the lift process through experiments. This method can provide some experiences to the construction and fabrication of the steel member of the project.