Exact Overlap Rate Analysis and the Combination with 4D BIM of Time-Cost Tradeoff Problem in Project Scheduling.
- Resource Type
- Article
- Authors
- Ma, Guofeng; Zhang, Lingzhi
- Source
- Advances in Civil Engineering; 5/2/2019, p1-12, 12p
- Subject
- MATHEMATICAL optimization
BUILDING information modeling
GENETIC algorithms
CONSTRUCTION projects
SCHEDULING
- Language
- ISSN
- 16878086
Copyright of Advances in Civil Engineering is the property of Hindawi Limited and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)