Installation of solar power plants as of September 2019 there were 1,435 PLTS installed with details of approximately 800 new PLN consumers since the policy on power plant was launched in December 2018. PLTS is a variant of Renewable Energy utilization made from the Government so that the utilization of Renewable Energy, especially for solar power, continues to increase. This study aims to determine the performance of the EXIM kWh meter system configured on the PLTS in the EBT Laboratory of IT - PLN, determine the power used in the load in the Laboratory with the installation of the EXIM kWh Meter Configured on the PLTS, and determine the cost of electricity bills and efficiency with the utilization of kWh EXIM in the PLN Institute of Technology Laboratory. While the research method is quantitative. The results of this study are the production of PLTS power installed in the Renewable Energy IT - PLN laboratory, not all of the power produced will be sent or exported to PLN, where some of the power that is not exported will supply to the load in the Renewable Energy IT - PLN laboratory. From the data obtained, the average percentage of savings per month in 7 months is about 13%. If the total average power is converted to Rp. 1,423,830 and if the total kWh usage is converted to Rp. 811,15 and provides savings on monthly electricity bills of around Rp. 612,673. The total production generated for 7 months from December 2020 - June 2021 is 53% of the total power production of this solar power plant which is imported to PLN and with this efficiency is good so that it can save tariff bills cost.