In this paper, the system architecture of the new generation substation centralized control mode is taken as the starting point. In addition, with the substation secondary system data, the data interaction and interface technology of substation remote control system based on centralized control mode are studied. The basic principles of the project implementation plan are proposed in this paper, which provides reference for the grid company in the construction and management of the new generation independent and controllable substation.