Hydraulic fracturing method for relieving stress concentration in remaining coal pillar in overlying goaf
- Resource Type
- article
- Authors
- Luying Shao; Bingxiang Huang; Xinglong Zhao; Shuliang Chen
- Source
- Energy Science & Engineering, Vol 12, Iss 4, Pp 1518-1530 (2024)
- Subject
- hydraulic fracturing
remaining coal pillar
stress concentration
stress transferring
weakening
Technology
Science
- Language
- English
- ISSN
- 2050-0505
Abstract The stress concentration caused by the presence of the remaining coal pillar in the overlying goaf can easily cause large deformation of the roadway in the lower seam and other problems. To solve this problem, the reasons for stress concentration caused by the remaining coal pillar in the overlying goaf were analyzed. A hydraulic fracturing method for relieving stress concentration has been proposed. By using hydraulic fracturing technology to remove the hanging roof on both sides of the coal pillar and weaken the coal pillar system, high stress is transferred to the goaf. The degree of stress concentration in coal pillars and surrounding rock of roadway can be reduced by 47% and 26%, respectively. This method can also solve the stress concentration problem of the remaining ore pillar in the overlying goaf of the metal ore. This method has been applied in the coal mine. The deformation of the surrounding rock of the test roadway after hydraulic fracturing has been reduced by more than 60%.