为了探究拦河闸除险加固工程中闸室结构的受力情况,以海塘安澜工程胜利长胜塘水闸为例,提出除险加固方案,并对方案进行受力分析.首先,对拦河闸现状进行分析,并对拦河闸提出除险加固方案;然后,基于水体的参数计算和拦河闸的整体分析,对拦河闸闸室结构在除险加固工程中的受力情况进行分析.最后,利用ANSYS有限元软件,对拦河闸闸室进行应力分析,验证分析方法的有效性.研究结果可为拦河闸除险加固工程中闸室结构应力分析提供新的思路.
In order to explore the force of the sluice structure in the reinforcement project of the river sluice,taking the Shengli Changshengtang sluice in the seawall Anlan project as an example,the reinforcement scheme is proposed and analyzed the force of the scheme.Firstly,the present situation of the sluice is analyzed,and the reinforcement scheme of the sluice is proposed,and then the stress situation of the block chamber structure in the reinforcement project of the sluice is analyzed.Finally,the force analysis was verified by using the ANSYS FE software.The research provides a new idea for the structural force analysis of the sluice chamber in the sluice reinforcement project.