结合贵州省某隧道涌突水处治的工程实例,通过专项水文调查对涌水原因进行了深入分析并确定了隧道瞬时最大涌水量,在此基础上提出了隧道病害的综合处治方案.该方案对类似工程有一定的指导和借鉴意义.
In combination with the engineering project of water inrush treatment in a tunnel in Guizhou province,the special hydrological survey is made to deeply analyze the reasons for water inrush and determine the maximum instantaneous water inflow of the tunnel.On this basis,the comprehensive treatment scheme for tunnel diseases is put forward.This scheme has some guidance and reference significance for similar projects.